I |
Area
of land allotted (in acres)
Whether land transferred in the Name of Samiti
Vidyalaya shifted to permanent buildings on
|
: 25 acres
: Yes
: No
(Running at Temporary site) |
|
ii |
Status of Boundary Wall a.
Brick Wall b.
Barbed wire fencing
|
(Construction not started)
|
|
iii |
Permanent buildings constructed
|
: (CBRI
pattern/ CPWD pattern)
: Constructed is to be started |
|
iv |
School building
|
:
Construction to be started
|
|
v |
Dormitories |
:
Construction to be started. |
|
vi |
Kitchen/dining Hall
No.
of shifts required for all students to take food |
:
Construction to be started
One |
|
vii |
Principal Residence
|
:
Construction to be started |
|
viii |
Staff Quarters
|
:
Construction to be started |
|
ix |
M.P.
Hall
|
:
Construction to be started |
|
x |
Workshop
|
:
Construction to be started |
|
xi |
Type
of O.H. Tank
Its
capacity
Present Status
|
:
Construction to be started
: NA
: NA |
|
xii |
U.G.
tank
Its
capacity
Present Status |
: Construction
to be started
: NA
|
|
xiii |
D.G.
Set
|
: Not
Available |
|
xiv |
Sewage Pump
|
:
HP (NA,
Temporary site) |
|
xv |
Water Pump
|
:
HP (NA,
Temporary site) |
|
xvi |
Electrification
Electric connection
Sub
Station building
Street lighting
Numbers of hrs. during day when power supply is available on an average. |
:
Rural (Temporary site)
:
Rural feeder (Temporary site)
:
Construction to be started (Temporary site)
: 22
Hours |
|
xvii |
Playfields
400
metre track
40 x
30 metre basket ball court
40 x
30 metre volley ball court
|
:
Temporary site
:
Available/ not available (Temporary site)
:
____Nos. – Available / not available (Temporary site)
:
____Nos. – Available / not available (Temporary site)
|
|
xviii |
Water supply
Tube
Well
Hand
pump
Connection from PHED
|
: Nil
:
Nil
: 04 hours supply in a day
(Temporary site) |
|
xix |
Rajiv Gandhi Smriti Van
|
: not available
(Temporary Site Without boundary wall) |
|
xx |
Fire
fighting arrangement
|
:
Working |
|
xxi |
Last
date of cleaning of
(a)
Septic tank
(b)
Water tanks |
:
09.04.08 (Temporary Site)
:
07.04.08 (Temporary Site) |
|
xxii |
Whether area around transformer is fenced |
:
NA (Temporary Site) |
|
xxiii |
Whether open wells, if any, are covered from top |
:
NA (Temporary Site) |
|
xxiv |
Works taken up under M&R fund during current year and last year:-
|
:
Fund Received from RO 2006-07
Rs. 50000.00
2007-08 Rs. 50000.00
|
|
Year |
Name
of work (M&R) |
:Expenditure
(Rs.
In lacs) |
Cumulative expenditure during the year |
|
2006-07 |
Building maintenance & repair - |
.49 |
.49 |
|
|
2007-08 |
Building maintenance & repair
|
|
|
|
W/Washing, C/Washing, Paintings etc. |
.09 |
|
|
|
Repairs/ Replacement of Doors |
.02 |
|
|
|
Repairs/ Replacement of Sanitary Fittings (WC
Seats, Taps, SW Pipes etc.) |
.05 |
|
|
|
Repairs/Replacement of W/Supply Fittings (Pipes,
Valves, Taps etc.) |
.13 |
|
|
|
Purchase of Electrical Items (Tubes, Bulbs,
Switchesetc.) |
.01 |
|
|
|
Electrical Works |
.11 |
|
|
|
Replacement of Broken Glasses. |
.03 |
|
|
|
Cleaning Campus, OHT, Sep. Tank |
.03 |
|
|
|
Other Repairs (Drains etc.) |
.10 |
|
|
|
|
.57 |
.57 |